The foundations of successful commissioning are attention to details and effective communication.

                                                                   

Grzegorz Bonter control systems engineer

Grzegorz Bonter

I’m an industrial automation engineering contractor that can offer over 9 years of experience of work in DCS/Safety field. During that time I gained not only technical knowledge but also learned how to find creative solutions to problems.

I can also call myself an experienced traveler. My work so far gave me an opportunity to perform my duties not only in cozy offices in France but also on both off-shore and on-shore gas installations in Netherlands as well as at farther destinations like Angola or Siberia. In many cases I wasn’t directly supervised and I had to work with clients to see my project to successful completion.

I love challenges and learning new things. Always try to look for ways to improve processes under my care and come up with creative solutions to issues that appear during my work.

SKILLS

                                                                   

Quick learner

Quick
learner

Creative engineering

Creative problem
solver

Industrial automation symbol offshore

Experience in wide
range of industries

Work under pressure

Well adjusted to work
under pressure

Yokogawa logo

Rich knowledge
of Yokogawa DCS system

International experience

Ease of work in
multinational environment

TESTIMONIALS

                                                                   

mateusz krystowczyk

Mateusz Krystowczyk, Project Manager at Schneider Electric

During the realization of GEC projects, I recognized Grzegorz as open-minded, solution oriented and flexible person. He is easy working with foreign partners with high adaptability to current situation. I would recommend him.

Wiktor Cegla, Managing director/CEO at Gram.pl

He cares more than the others. That’s why I wanted him back when he left.

EXPERIENCE

                                                                   

Oct 2020

Aug 2019

Yokogawa Belgium – Safety and Distributed Control Systems Commissioning 

Project: Ajinomoto Omnichem (6 months)

Industry: Biopharmaceutical

Prepared modifications to the safety system:

  • removal of obsolete elements
  • implementation of 10+ new IOs
  • build up of logic
  • setup of communication with DCS
  • performed FAT with client. Project was GAMP compliant.

DCS work was consisting of making corrections based on outstanding punch items and results of tests with client. Took care of documentation tracking changes and work being done.

                                                                   

Project: Syngenta (2 months)

Prepared modifications to existing installations on client’s side, for a chemical company. Integration of DCS and Safety system controlling loading and unloading of TDI and MDI isocyanates from the truck bay to the tanks and further up the production stream.

Was in charge of:

  • IO definition (~130 IO points)
  • Design of HMI UI screens for operators
  • Implementation of interlock logic
  • Creation of sequences that were loading/unloading product
  • Design of interface for newly incorporated parts of the system
  • Troubleshooting Safety system before FAT

Jun 2019

Oct 2018

Yokogawa Germany – Safety and DCS Commissioning

Project: ZapSib 2, Tobolsk, Russia (6 months)

Industry: Oil refinery / polypropylene production

Polypropylene production plant. Implementation of modifications to both DCS, Fire & Gas and Safety system of the plant. Design of several new templates of logic for 200+ motors. Coordinated workload within team consisting of multiple nationalities from different contracting companies. Consulted client on the solutions to be implemented in the system. Troubleshot the system when technological issues occurred. Providing support to the client’s commissioning team during start-up of the plant – including investigation of incidents.

Apr 2018

Nov 2017

Yokogawa Netherlands – DCS Consulting

Project: BP West Nile Delta (6 months)

Performed Factory Acceptance Tests of Modbus communication with a client, ensuring integrity of a project and compliance with a design. Was also in charge of implementing modifications contained in mod packs requested by customer.

Sep 2017

Feb 2017

Yokogawa Germany – DCS Consulting

Project: Shell Grasbrook Lubricants Center (6 months)

Industry: Automotive oil production

Worked at Shell oil production facility in Hamburg, Germany. Responsible for preparation of modifications to the system – mainly control logic, I/O and graphics adjustments. Conducted functional tests and implemented changes to live system. Software: Centum VP 5

Jul 2016

Sep 2015

Yokogawa UK – Service & Support Engineer

Location: Runcorn (9 months)

• Designed and implemented (Application/Hardware/Software) modifications/upgrades and expansions, as agreed with client and make them ready for site installation.
• Designed and implemented modifications/upgrades and expansions resulting in cabinet, rack layouts, software etc., as agreed with the client and make them ready for site installation.
• Supervise and/or execute site installation, modification/upgrade, and if applicable commissioning and/or performing Site Acceptance Test, completed with customer authorized documents of acceptance. Take timely corrective actions if needed.
• “Fast and adequately” supported customers in line with the agreed contractual obligations, resulting in a correctly functioning instrumentation/equipment/system/application and satisfied client.
• Executed maintenance activities (remote, preventive, shutdown and health check) resulting in healthy systems and maximized instrumentation/equipment/systems/applications and satisfied customer.

Involved in projects:
SITA Teesside Energy from Waste plant – Preventive Maintenance
Lakeside Energy from Waste plant in London – Upgrade of the system from Centum CS3000 to Centum VP.
Wytch Farm – conducting FAT with client and modfications in DCS and Safety System
South Hook LNG Terminal – phase 1 of upgrade of the project. Troubleshooting issues after shutdown.
Eastham Refinery – Preventive Maintenance; fixes to the Alarm Management system.
Leman platform – commissioning of new jacket and hand over to client.
SSE Atwick Gas Storage facility – commissioning.

Aug 2015

Mar 2013

Yokogawa NL – Service & Support Engineer

Location: Amersfoort, Netherlands

Duration: 2,5 years

Modification of existing projects required by maintenance work being done on site (both logics/signal transfer and HMI)

  • Upgrade of outdated Yokogawa systems being used in production
    Assembly and preparation of equipment for FATs and iFATs
  • Commissioning systems on site – mainly offshore gas platforms on the North Sea but also onshore sites in Netherlands (Groeningen province)
  • Providing support for the customer and keeping in contact with other commissioning engineers to ensure compatibility of communication
  • Design of PLC logics and HMI screens
  • Preparation of work packages for gas platforms expansion
  • Preventive maintenance

Work offshore:

  • Barque PB (England) – installation and commissioning of new Koss Skid.
  • Lima 15 – implementation and commissioning of gas sampling module.
  • Preventive maintenance and incorporation of communication to Clampon.
  • Lima 05 – upgrade to Centum VP and expansion with a new Tie-in jacket (creation of HMI screens, implementation of control narrative, system consisted of 3 compressors) , addition of F&G graphics. Removal of Double flowlines.
  • Foxtrot 3 – performed maintenance work on existing system. Incorporation of communication to Clampon.
  • Leman Alpha – commissioning of new jacket (implementation of punch items, assistance to start-up of platform’s subsystems).

Work onshore:

  • NAM Coevorden 24 – small modifications on existing pump system.
  • NAM Grijpskerk – assistance to the start-up of the plant. Troubleshooting of remaining problems after upgrade to Centum VP.
    Software: Centum CS, Centum VP 5, VP 4, ProSafe RS 3.XX

Languages

                                                                   

Polish – fluent

English – fluent

Spanish – working proficiency